Daily Archives: April 25, 2019

Review Schedule

sp 19 review

 

The link above list your name, day and time for your review. Please remember to come early to install your work.

You can also find a print out of the schedule in Harder Hall in Dale’s Studio and on the top floor of Cohen by the front door.

List of works for final reviews

Hi students,
Below is a list of each of the works you are responsible for having present for your reviews. Be mindful of which group you are in.
 

COLAB:

Sara/Hsini

Group C:

1. How to Zine

2. Letter to Administrator (documentation)

3. Final sub corp video

4. Sub Corp Silk Screen

Group B:

1. How to Video

2. Documentation from sub corp community engagement

3. Sub Corp Silk Screen

4. Choose one Letter you sent during CoLab (documentation)

Angie/Hsini:

D group:

1. Final video

2. Final double interview project

3. 10-12 question cards

A group:

1. Final audio

2. final video

FUSE LAB

Lydia:

(both groups)

1. Albers

2. Color match compositions

3. Final Portrait

Kat:

(both groups)

1. Color gradient (optional)

2. Albers

3. Color match compositions

4. Final portrait

SEE LAB

Dale:

C group:

Choose the best 3 from:

  • 2 Multiple contour/cross-contour drawings (you can choose the best of these or the pair)
  • Small ink collage OR its corresponding drawing
  • Still life
  • Final

B group:

 Choose the best 3 from:

  • 2 Multiple contour/cross-contour drawings (you can choose the best of these or the pair)
  • Glass drawing
  • Small collage
  • Final

Sarah/Myles:

(both groups)

1. woodblock and glass prints

2. best 2 Marky Mark drawings (one color one black and white)

3. best 2 Sol LeWitt instructional drawings

4. finished pieces from SEELab

MAKE LAB

Jason/Sydney:

(both groups)

3 images of documentation of final ceramic/fiber piece

John Gill:

(both groups)

1 ceramic piece of your choice (actual object or documentation)